DCIM100GOPROGOPR4267.

Carleton College West Gym HVAC

This project included the removal and replacement of the existing Air Handling Unit (AHU) serving the West Gym Natatorium. The existing AHU was originally hung from the structure, suspended over a dirt floor and required removal through the makeup air intake. A new concrete slab was installed for the replacement AHU that was set on the floor. This replacement AHU entered the basement through the same makeup air intake area well and was assembled in the basement.

City/State

Northfield, MN

Project Owner

Carleton College

Architect

Collaborative Design Group